博客
关于我
强烈建议你试试无所不能的chatGPT,快点击我
SAP PP Using MRP Areas
阅读量:6526 次
发布时间:2019-06-24

本文共 2059 字,大约阅读时间需要 6 分钟。

SAP PP Using MRP Areas

By

Normally materials planning take place on PLANT level.

By using MRP areas -; specific storage locations can be grouped together and planning take place on that grouping (the MRP Area).
Example: Plant 3200 / Sloc 50 and Plant 3200 / sloc 51 in one MRP Area
This is done in Configuration.
When activated, materials can now be planned (MRP types, Lot size, etc...) per MRP Area. And MRP runs can also be done on MRP Area.
Consumption history will be kept on MRP Area level.
Material Master data
When creating / changing materials -; you will see MRP Areas in MRP1 view
http://sap123.com/files/f/136.gif
http://sap123.com/files/f/137.gif
Material data fields on MRP Area level
http://sap123.com/files/f/138.gif
How to use MRP Areas -; Running MRP
When you run MRP, you can run it either for PLANT or MRP AREA.
Example: For a material

  • For Plant 3200, set MRP Type = V1, ROP = 300

  • For MRP Area 3200_1 (within plant 3200), set MRP Type = V1, ROP = 100

    If we run MRP for Plant 3200, SAP creates a PR of qty 300 (because ROP = 300).

    If we run MRP for MRP Area 3200_1, SAP creates a PR of qty 100 (because ROP = 100)
    Consumption History
    Consumption History is stored on the lowest level either Plant or MRP Area level.
    If MRP Area = plant then Consumption History is available in
    Menu: Display Material (MM03) > Additional data > Consumption
    Example for plant 3100 (where MRP area is on PLANT)
    http://sap123.com/files/f/139.gif
    For MRP Area 3200_1, this information is accessed via MRP1 view.
    http://sap123.com/files/f/140.gif
    Tables where consumption data are stored:

  • Table MVER --> Plant Level

  • Table DVER --> MRP Area level

    Configuration to take place in order to use MRP Areas

    Start of by looking at SAPNet for notes on MRP Areas.
    Steps to follow:
    Step 1: Convert planning file entries (SE38 program RMDBVM00)
    THIS IS DONE ONCE OFF
    Program: RMDBVM00
    http://sap123.com/files/f/141.gif
    Step 2 Activate requirements planning for MRP areas
    http://sap123.com/files/f/142.gif
    http://sap123.com/files/f/143.gif
    Step 3 Define MRP Areas
    http://sap123.com/files/f/144.gif
    The Receiving storage location is the default sloc that will be in PR that was created by MRP.
    A MRP area consists of one or more storage locations. This is where they are defined.
    http://sap123.com/files/f/145.gif
    SAP version used for this post: SAP ECC (ERP Central Component) 5.0
    ----------- END OF POST -----------

     

     

转载地址:http://zwibo.baihongyu.com/

你可能感兴趣的文章
Python的函数参数传递:传值?引用?
查看>>
[转]分享2011年8个最新的jQuery Mobile在线教程
查看>>
android call require api level
查看>>
Mac下android环境搭建
查看>>
创建Visual Studio项目模版向导的几篇参考文章
查看>>
深入浅出SQL Server Replication第一篇:走近Replication(上)
查看>>
[TopCoder][SRM] SRM 562 DIV 2
查看>>
SQLSERVER是怎麽通过索引和统计信息来找到目标数据的(第一篇)
查看>>
获取线程结束代码(Exit Code)
查看>>
简明 Vim 练级攻略 | 酷壳 - CoolShell.cn
查看>>
LocalAlloc,VirtualAlloc,malloc,new的异同
查看>>
回调函数
查看>>
win7 x64 jdk1.7.0_51
查看>>
45 Useful Oracle Queries--ref
查看>>
这些开源项目,你都知道吗?(持续更新中...)[原创]
查看>>
小菜学习设计模式(四)—原型(Prototype)模式
查看>>
linux中利用iptables+geoip过滤指定IP
查看>>
在myeclipse中写sql语句的细节问题
查看>>
使用ShellExecute打开目标文件所在文件夹并选中目标文件
查看>>
Lombok简化Java代码的好工具
查看>>